0 Members and 1 Guest are viewing this topic.
So the list of jobs that need doing is now in 1) Replace engine and gearbox mounts 2) Front prop shaft universal joints 3) Bump stops all round 4) Full coolant hose replacements 5) 4 new tyres and a new battery 6) NSF brake cylinder 7) Recondition master brake cylinder 8) Handbreak shoes 9) Refirb and then put back the series 1 dash 10) Full wiring loom replace 11) New ignition system - leads , rotor arm , cap etc 12) wax oil the Chassis 13) Replace hard top with new softtop 14) 3 new front seats